ZEPHYRA

0%

SOLUTION 04

Land & Community

Shared-benefit projects on farmland and municipal sites: transparent production data for landowners, councils and co-operatives.

var(--variable-By_daIBiy)

AT A GLANCE 01

140

Community and shared-benefit projects reporting through the ledger.

AT A GLANCE 02

100%

Of landowner and co-operative payments settled on measured, not modelled, output.

AT A GLANCE 03

24/7

Public read access to production data, no login required.

How it works

Built for the asset it watches

4.9

The measurement stack wasn’t just a dashboard — it was a scientifically grounded system built for our asset class.

Ingrid Halvorsen, COO, Norvind Energi

Ingrid Halvorsen

COO, Norvind Energi

What we measure

When a farm, a council or a co-operative shares in a project’s revenue, trust in the production figure is the whole relationship. Zephyra measures output at the point of generation and publishes it in a form a landowner can read on a phone — with the same signed, timestamped lineage a lender would see.

Hydro releases, rooftop arrays and single turbines are covered with hardware sized to the project, not to a utility.

How it works

Each site is instrumented once and read continuously. Revenue-share and lease formulas are mapped onto the ledger so every payment traces back to measured megawatt-hours, and a public dashboard shows the community what its project delivered this week, this season and since commissioning.

Councils and regulators get read-only access to the same record, which shortens consent renewals and settles rate questions without a hearing.

What you get

Payments nobody disputes. A public record that keeps a community on side for the life of the asset. And a compliance history that turns a century-old plant, or a brand-new rooftop, into an auditable asset.

Capabilities

What comes with it

01

Right-sized hardware

Instrumentation scaled to a single turbine, a rooftop or a hydro gate, not to a utility fleet.

02

Revenue-share mapping

Lease and co-operative formulas run directly on measured output, so every payment is traceable.

03

Public dashboard

A plain-language view of what the project delivered, open to the community without a login.

04

Consent & compliance

Signed production history for councils and regulators, ready for renewals and rate reviews.

Proof in the field

See it working

Aerial view of wind turbines among farmland beneath drifting clouds

640 MW onshore wind

Verified

Norvind cuts curtailment 31%

A 640 MW onshore fleet across northern Norway was losing output to curtailment nobody could attribute. Nacelle-level measurement made every lost megawatt-hour traceable to a turbine and an hour.

Asset

640 MW onshore wind

640 MW onshore wind

Delivered

2024

2024

Ingrid Halvorsen

Ingrid Halvorsen

COO, Norvind Energi

Aerial view of diagonal solar panel rows across green fields

1.2 GW utility solar

Verified

Helia Solar goes bankable

Helia's 1.2 GW solar portfolio needed performance evidence its lenders would accept without a third-party audit. String-level measurement, reconciled against irradiance, gave them a record that speaks for itself.

Asset

1.2 GW utility solar

1.2 GW utility solar

Delivered

2025

2025

Mateo Ferrán

Mateo Ferrán

Head of Asset Performance, Helia

High-voltage pylon and power lines silhouetted against a sunset

380 interconnection points

Verified

Meridian Grid verifies at scale

A regional grid operator with 380 interconnection points was reconciling energy flows quarterly, by hand. Metering every hand-over to a single ledger brought settlement close to live and ended the arguments.

Asset

380 interconnection points

380 interconnection points

Delivered

2024

2024

Priya Raman

Priya Raman

Director of Regulatory Affairs, Meridian Grid

Aerial view of wind turbines among farmland beneath drifting clouds

690 MW offshore wind

Verified

Nordsee Delta proves 2.1 TWh

Three lenders, one offshore wind farm and no agreed production figure. Nacelle-level evidence committed to a shared ledger let Nordsee Delta prove 2.1 TWh of output to all of them at once.

Asset

690 MW offshore wind

690 MW offshore wind

Delivered

2025

2025

Marit Boeckmann

Marit Boeckmann

Head of Asset Management, Nordsee Delta

Solar panels beside a white battery storage container under a cloudy sky

480 MWh battery storage

Verified

Aurora settles dispatch disputes

An offtaker and an operator disagreed about round-trip losses at a 480 MWh battery for eight months. Instrument-level dispatch data replayed from the ledger settled it in an afternoon.

Asset

480 MWh battery storage

480 MWh battery storage

Delivered

2024

2024

Tomas Ek

Tomas Ek

Director of Trading, Aurora Storage

Hydroelectric dam spanning a forested river valley

38 MW run-of-river hydro

Verified

Cascade Hydro becomes auditable

Ninety years of paper records and no way to prove any of it. Measuring every release at the gate turned a century-old hydro plant into an asset a regulator, and a lender, could audit.

Asset

38 MW run-of-river hydro

38 MW run-of-river hydro

Delivered

2025

2025

Priya Raghunathan

Priya Raghunathan

Compliance Lead, Cascade Hydro

Create a free website with Framer, the website builder loved by startups, designers and agencies.