38 MW run-of-river hydro

Cascade Hydro becomes auditable

Ninety years of paper records and no way to prove any of it. Measuring every release at the gate turned a century-old hydro plant into an asset a regulator, and a lender, could audit.

CLIENT

Cascade Hydro

LOCATION

British Columbia, Canada

CAPACITY

38 MW run-of-river hydro

DELIVERED

2025

Hydroelectric dam spanning a forested river valley

RESULT 01

1931

Year the plant was commissioned. Its first signed production record was written in 2025.

RESULT 02

6 wks

To instrument every gate and turbine and reconcile the first full season.

RESULT 03

14 mo

Shaved from the plant's water-licence renewal, settled on ledger evidence.

The story

From the field to the ledger

var(--variable-KXMx_iqe3.By_daIBiy)

SOLUTION USED

Land & Community

The challenge

Cascade’s plant had run since 1931 on a water licence that required annual reporting of flows and generation. The reports were assembled from gate logbooks, a 1980s flow meter and a good deal of institutional memory — and the regulator had begun asking for evidence that none of those sources could provide.

A planned refurbishment needed financing, and lenders were unwilling to lend against a production history nobody could verify.

What we did

Zephyra fitted each spillway and intake gate with calibrated flow instrumentation and read each turbine at the generator terminals, with hardware sized to a 38 MW plant rather than a utility fleet. Every release and every megawatt-hour was signed at source and committed to the ledger, and the plant’s licence conditions were mapped onto it so compliance could be read directly.

The regulator and the lending syndicate were given the same read-only access.

The outcome

The water-licence renewal, which had been expected to take two years, was settled fourteen months early on the ledger record. The refurbishment financed against a production history that, for the first time in ninety years, could be checked by anyone with the link.

Priya Raghunathan

“We had ninety years of paper records and no way to prove any of it. Now every release is measured at the gate and signed before it reaches the regulator.”

Priya Raghunathan

Compliance Lead, Cascade Hydro